+91 22 62356235
info@globotranspro.com

Follow Button

Client Testimonials

{"number_of_column":"1","number_of_column_desktop":"1","number_of_column_small_desktop":"1","number_of_column_tablet":"1","number_of_column_mobile":"1","auto_play":"true","auto_play_speed":"3000","scroll_speed":"600","pause_on_hover":"true","infinite_loop":"true","navigation":"true","pagination":"true","swipe_on":"true","mouse_draggable":"true","rtl_mode":"false"}

"GloboTransPRO successfully completed the critical project of Berthing our Vessels 'Havila Fortune' and 'Mac Phoenix' at a suitable Port with adequate water draft, including Transfer of Equipment - containers and reels, the heaviest wearing weighing 10 MT, from one Vessel to other, welding of the material on Vessel and cutting and welding back the Desk for Motor replacement. They also removed the non-working old Motor weighing 7 MT, removed the Coupling from the old Motor at a workshop outside the Port, and fitted the same Coupling on the new Motor, and installed the new Motor back on the Vessel. The scope also included Agency Services like fresh water supply, sludge removal and diving services through sign-on / sign-off, Gate Passes for various agencies and expats, etc. for both vessels, and required permissions from JNPT and BMTC including Port, Customs and Immigration. All these services were given and completed within 4 days safely and to our satisfaction. We are impressed with the professional approach, dedication, commitment, and domain knowledge of GloboTransPRO and recommend them for such services in future."

Operations Manager, India project office, SAExploration

"GloboTransPRO was the Logistic Service Provider for Transportation, Custom Clearance and Warehousing (storage) for hazardous chemicals from Mundra Sea Port to Barmer for Cairn India to carry out their petroleum operations on their Block RJON – 90/1 for a period of one year. GloboTransPRO were able to deliver the cargo within the stipulated time frame as per the high standard of safety guidelines laid down by Cairn Oil & Gas India (part of Vedanta Resources). GloboTransPRO understood the entire logistics plan, identified the gaps, and offered seamless solutions with back-up plans to ensure end-to-end services and were meeting or exceeding expectations all the time. We are highly pleased with the level of professionalism, expertise and the safety standards displayed by GloboTransPRO in their overall services to us and would recommend them for similar activities in the future."

Chief Operating Officer, Berryman Chemical Inc.

"GloboTransPRO is the Shipping Agent for our Rigs and has provided commendable Logistics and Agency Services for Repair and Maintenance at Mumbai Port. On a very short intimation they cleared our Rig Valiant Driller from Mumbai Port to ONGC field - towing the Rig, Inward / Outward formalities, availing necessary permissions from Customs, Port and Immigration Authorities, fulfilling various others statutory requirements in less than half a day. We are highly pleased with their expertise, knowledge, operational capability, safety compliance and recommend them highly for similar activities in the future. We found them as one of our reliable, cost effective logistics service provider."

General Manager, Dynamic Drilling and Services

"... Besides satisfying Petrofac's stringent requirements regarding Transport Engineering and related analysis, Globotrans Pro was also interacting with the Marine Warranty Surveyor (MWS), M/s London Offshore Consultants (LOC) ensuring that the documents were approved by them, as per their guidelines. We are highly satisfied with the engineering skills and expertise of GloboTransPRO."

Head of Industrial Project, DHL, Oman

"GloboTransPRO was awarded the job of Unloading 228 packages from Trailers and Installation & Commissioning of the JIER 1x1300T + 4x630 T  Press Line at our Halol Plant in Gujarat. They Unloaded the 228 packages including 7 Heavy Lifts from Hydraulic Axles at the MGM Press site from the Trailers with their 600 Tons Hydraulic Gantry Lift System, Lifting equipment and Tools / Tackles. The installation of the first Bed to the last Heavy Lift fully assembled Crown weighing more than 200 tons was completed in 20 days. The operational capability and workmanship of GloboTransPRO's manpower and equipment has been very good and they maintained all standards of excellent workmanship."

General Manager, MG Motors - India

"We awarded GloboTransPRO the job of Unloading from Trailers, Installing and Commissioning of our 1x1300T + 4x630T Tandem Line Press at Morris Garages Motors's plant at Halol, Gujarat. The Press comprised of 288 packages weighing a total of 2019 MT, which included 7 Heavy Lifts with the heaviest Crown weighing 170 MT. GloboTransPRO simultaneously Unloaded the Press Parts from Trailers and Installed the Press concurrently thereby completing the heavy parts installation in only 20 days, which is a record outside China. This is one of the fastest heavy parts Installation of a big Tandem Line Press ever done by JIER. We are highly pleased with the engineering skills, domain knowledge and expertise, operational capability, safety compliances and workmanship of GloboTransPRO's Manpower and Equipment and recommend them highly for such jobs in the future."

Deputy General Manager, JIER Machine-Tool Group Company, China

"We are pleased with the Engineering skills, operational expertise and dedication and commitment of GloboTransPRO during handling of the 51 nos. of Xianye (China) Glass forming Modules measuring 11900mm x 4800mm x 5000mm and weighing 34.4 MT each.  Modules were received from the Ship's Hook at Mumbai Port, temporarily unloaded at the Port, Transported and Unloaded at a temporary Warehouse and then delivered to our Taloja site, as per our required Erection and Installation sequence. We highly recommend them for such projects in the future."

Director (Projects), Owens Corning